Section XIV. PLGR BRACKET INSTALLATION
14-1. Install PLGR bracket (10) on integrated rack (1) with four screws (11).
14-2. Locate, mark, and drill one 0.201-in. diameter hole (9) in right-side engine tunnel (8).
14-3. Remove paint from vicinity of hole (12) on integrated rack (1) and hole (9) on right-side engine
tunnel (8). Apply anti-seize compound as required.
14-4. Fabricate ground strap (5) from 8.00-in. length of braided wire and two terminal lugs.
lockwasher (2), and nut (3).
14-6. Install ground strap (5) on right-side engine tunnel (8) with self-tapping screw (7) and two
lockwashers (4).
5
4
4
6
4
3
7
2
1
8
12
~
9
10
2.
LOCKWASHER MS35338-44 QTY. 1
3.
NUT 9419143 QTY. 1
11
4.
LOCKWASHER MS45904-68 QTY. 4
5.
GROUND STRAP
BRAIDED WIRE AA59569F30T0375 QTY. A/R
TERMINAL LUG MS20659-129 QTY. 2
6.
CAPSCREW B1821BH025C100N QTY. 1
7.
SELF-TAPPING SCREW 9426241 QTY. 1
10.
PLGR BRACKET 986-0645-001 QTY. 1
11.
SCREW MS35206-263 QTY. 4
Figure 5-43.
|