|
| TB 9-2320-280-35-2
Section X. FBCB2 COMPONENTS INSTALLATION
NOTE
SINCGARS model AN/VRC-92F shown.
10-1. Remove paint from vicinity of four holes (8) on integrated rack (7) and on both sides from vicinity
of four holes (10) on CPU isolation kit (4). Apply antiseize compound as required.
10-2. Install CPU isolation kit (4) on integrated rack (7) with three capscrews (3), washers (2), and
lockwashers (1), leaving open holes (8) and (10).
10-4. Install CPU (6) on CPU isolation kit (4) with two existing fastener guards (5).
10-5. Fabricate ground strap (13) from 8.00-in. length of braided wire and two terminal lugs.
10-6. Install ground strap (13) on CPU ground stud (17) with existing washer (14), lockwasher (15), and
wingnut (16).
10-7. Install ground strap (13) on CPU isolation kit (4) and integrated rack (7), with capscrew (11),
washer (2), and two lockwashers (12).
4
3
2
5
1
6
6
5
10
4
10
11
2
17
16
12
14
10
15
7
9
13
8
1.
LOCKWASHER MS35338-44 QTY. 3
2.
WASHER 2436161 QTY. 4
3.
CAPSCREW B1821BH025C100N QTY. 3
4.
CPU ISOLATION KIT 872826-2 QTY. 1
6.
CPU 881292-1 QTY. 1
11.
CAPSCREW B1821BH025C125N QTY. 1
12.
LOCKWASHER MS45904-68 QTY. 2
13.
CPU GROUND STRAP
BRAIDED WIRE AA59569F30T0375 QTY. A/R
TERMINAL LUG MS20659-141 QTY. 2
Figure 5-26.
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |