|
| TB 9-2320-280-35-13
NOTE
Loosen left-side tunnel insulation before performing steps 21-6
through 21-8. (Refer to TM 9-2320-280-20.)
SINCGARS model AN/VRC-92F shown.
Previously routed cables are not shown for clarity.
21-6. Route INC-EPUU cable (12) from integrated rack (14) down through center access hole (13) and
under left-side tunnel insulation (19) towards rear of vehicle.
21-7. Route power cable (15) forward and under integrated rack (14) and under left-side tunnel
insulation (19) towards rear of vehicle.
21-8. Route URO extension cable (18) towards URO bracket (17) between loudspeakers (16) and connect
to URO bracket (17) with four screws (20), lockwashers (21), and nuts (22). Route remaining URO
extension cable (18) under left-side tunnel insulation (19) and towards rear of vehicle.
21-9. Secure left-side tunnel insulation (19). (Refer to TM 9-2320-280-20.)
12.
INC-EPUU CABLE A3279383-3 QTY. 1
15.
EPLRS POWER CABLE A3004939 QTY. 1
12
18.
URO EXTENSION CABLE A3005328 QTY. 1
20.
SCREW 9417875 QTY. 4
13
21.
LOCKWASHER 131043 QTY. 4
22.
NUT 116002 QTY. 4
19
14
18
16
15
18
20
17
17
TUNNEL
INSULATION
16
21
22
5-63
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |