Section XXI. EPLRS CABLES INSTALLATION (TWO-MAN VEHICLES)
NOTE
Loosen right-side tunnel insulation before performing step 21-1.
(Refer to TM 9-2320-280-20.)
Perform following procedures for two-man vehicle configuration
only.
21-1. Route power cable (15) under right-side tunnel insulation towards terminal board. (Refer to
21-2. Attach heat shrink tubing (3) and two terminal lugs (1) and (8) to power cable negative lead (7) and
power cable positive lead (4). (Refer to TM 9-2320-280-20 for terminal connector repair.)
21-3. Connect power cable positive lead (4) to 24V terminal board (10) located on cab
enclosure panel (11) with existing nut (2).
21-4. Connect power cable negative lead (7) to ground strap (9) located on cab enclosure panel (11) with
existing nut (6). Secure leads together with tiedown strap (5).
21-5. Secure right-side tunnel insulation. (Refer to TM 9-2320-280-20.)
1
2
3
11
4
5
~
10
9
6
8
7
3
1.
TERMINAL LUG 7728780 QTY. 1
3.
SHRINK TUBING MS23053/4-302-0 QTY. A/R
5.
TIEDOWN STRAP MS3367-1-0 QTY. A/R
8.
TERMINAL LUG 7728777 QTY. 1
Figure 5-82.