| TM 11-6660-204-25
ity is accomplished by means of the operational test
(5) Wires broken because of excessive vibration.
chart (para 3-23). The chart gives the item to be
(6) Defective tubes or vibrator inverter.
tested, the action and conditions under which the
b. When the cause of failure is not immediately
item is tested, the normal indications of correct oper-
apparent, check as many of the above items as is
ation, and the corrective measures. To use the opera-
practicable before starting a detailed examination of
tional test procedures chart, follow the items in nu-
the component parts of the system. Before perform-
merical sequence.
ing the tube checks, refer to paragraph 3-24. If possi-
b. Corrective Measures. The corrective measures
ble, obtain information from the operator of the
listed are those most commonly required to correct
equipment regarding performance at the time trou-
for abnormal indications. In most cases, the column
ble occurred.
indicates the area in which a malfunction must exist
c. Visually inspect the recorder for obvious abnor-
to cause the abnormal indications. Use conventional
malities.
troubleshooting procedures to isolate the malfunc-
tion or trouble. A troubleshooting flowchart is pro-
vided in paragraph 3-22 and figure 3-13.1.
a. General. Determination of operational capabil-
3-15
Change 3
|