|
| g. Set all Radio Sets' PWR switches (15) to up (on)
h. Check out communications link by establishing communications between R/T1 and R/T4 via R/ T2 and R/T3.
NOTE
If R/T3 TRANSMIT indicator (3) does not illuminate when R/T1 is transmitting or
remains illuminated when R/T1 is not transmitting, R/T2 squelch is not adjusted
right.
If R/T2 TRANSMIT indicator (3) does not illuminate when R/T4 is transmitting or
remains illuminated when R/T4 is not transmitting, R/T3 squelch is not adjusted
right.
i.
If the communication link is secured, refer to paragraph 2-12 and reconfigure R/T1 and R/T4.
j.
If the communications link is not secured, the equipment is ready for use
2-11. Satellite Operation
Satellite operations are used for extremely long ranges or when equipments are not available for relay operations. The
AN/URC-101 or AN/URC-104, along with at least a 6 dB gain directional antenna, must be used for this configuration. To
setup and operate via satellite, refer to Figures 2-7 and 2-9 and perform the following steps:
2-31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |