|
| TM 11-5895-1141-34
CHAPTER 3
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SERVICE UPON RECEIPT
SECTION CONTENTS
Page
Unpacking................................................................................................................................
Checking Unpacked Equipment ..............................................................................................
3-1. UNPACKING
Unpack the Radio Channel Control equipment, insuring that no damage or indentations have occurred in transit. Unpack
the equipment on a level surface being careful not to drop the unit.
CAUTION
Any sudden or severe jarring of the equipment may
possibly damage or detune sensitive circuits contained
in the console.
3-2. CHECKING UNPACKED EQUIPMENT
a.
Inspect the equipment for any damages incurred during shipment. If the equipment has been damaged, report
the damage on SF 364.
b.
Check the equipment against the component listing in the operator's and organization maintenance manual, TM
11-5895-1141-12, and the packing slip, to insure the shipment is complete. Report all discrepancies in accordance with
the instructions in TM 38-750. The equipment should be placed in service even if a minor assembly or part that does not
affect proper operation is missing.
c.
Check to determine whether the equipment has an MWO number on the front panel, near the nomenclature
plate. Also check if all currently applicable MWO's have been applied. Current MWO's applicable to the equipment are
listed in DA PAM 310-4.
3-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |