6625-01-098-2534)">

 

Click here to make tpub.com your Home Page

Page Title: Chapter 2. SERVICE UPON RECEIPT AND INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5825-270-23
CHAPTER 2
SERVICE UPON RECEIPT AND INSTALLATION
2-1. Unpacking
adjustments of the monitor receiver are listed in
The monitor receiver is packed in a cardboard box;
Table 2-1. Tools and Test Equipment Required
unpacking of the monitor receiver is straightforward and
does not require any special instructions.
Item
Common Name
2-2. Checking Unpacked Equipment
Electronic Counter Mainframe
Frequency Counter
TD-1209/U
a. Inspect the Monitor receiver for damage which
Multimeter AN/USM-223
may have occurred during shipment. If monitor receiver
Tool Kit, Electronic Equipment
Toolkit
has been damaged, report the damage on SF 361.
TK-105/G
b. Check  the  monitor  receiver  against  the
Oscilloscope OS-261/U
components of end item list (COEIL) in the Operator's
Manual (TM 11-5825-270-10) and the packing slip to see
b. Adjustment Procedures. Refer to figure 2-1 and
if the equipment is complete. Report all discrepancies in
proceed as follows:
accordance with paragraph 1-3. The monitor receiver
should be placed in service even though a minor
assembly or part that does not effect proper functioning
is missing.
c. Check to see whether the monitor receiver has
been modified (equipment which has been modified will
have the MWO number on the front panel near the
nomenclature plate).  Check also to see whether all
applicable MWO's have been applied (current MWO's
applicable to the equipment are listed in DA PAM 310-4
as applicable).
2-3. Installation Instructions
Installation of the monitor receiver will be accomplished
by a special installation team.
2-4. Post-Installation Adjustments
(Figure 2-1 Sheet 1 of 4)
(Figure 2-1 Sheet 2 of 4)
NOTE
(Figure 2-1 Sheet 3 of 4)
The following adjustments must be
(Figure 2-1 Sheet 4 of 4)
made at the time of initial installation
or whenever the monitor receiver or
its assemblies are replaced.
Figure 2-1 (1). Identification of Adjustments/Controls
a. Tools and Test Equipment Required  The tools
(Sheet 1 of 4).
and  test  equipment  required  for  post-installation
2-1


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business