Click here to make tpub.com your Home Page

Page Title: Section IV. PERFORMANCE TEST AND TROUBLESHOOTING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM
11-5820-919-40-1
SECTION IV
AND TROUBLESHOOTING
PERFORMANCE
TEST
INTRODUCTION.
diagrams  (chapter  2),  and  the  schematic
Once a fault has been iso-
The  performance  test  and  trouble-
5-34.
lated  and  corrected,  the  performance
shooting  procedures  are  combined  into  a
Do not skip blocks in
test  is  repeated.
single  flowchart  scheme  (chapter  3).
the  performance  test,  because  succeeding
This  allows  the  maintenance  technician
blocks may  be  predicated on  certain
to  check  the  receiver/exciter  (A1)  for
faults being  eliminated.
normal  indications,  and  to  branch  off
for  troubleshooting  if  the  indications
PERFORMANCE
TEST.
The  troubleshooting  is
are  abnormal.
only an aid for isolating to a probable
The  performance  test  setup  is
5-36.
The  flowcharts  should  be  used  in
fault.
shown  in  figure  5-4  and  the  performance
conjunction  with  the  functional  block
test is shown in figure 5-5.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business