|
| TM
11-5820-919-40-1
SECTION IV
AND TROUBLESHOOTING
PERFORMANCE
TEST
INTRODUCTION.
diagrams (chapter 2), and the schematic
Once a fault has been iso-
The performance test and trouble-
5-34.
lated and corrected, the performance
shooting procedures are combined into a
Do not skip blocks in
test is repeated.
single flowchart scheme (chapter 3).
the performance test, because succeeding
This allows the maintenance technician
blocks may be predicated on certain
to check the receiver/exciter (A1) for
faults being eliminated.
normal indications, and to branch off
for troubleshooting if the indications
PERFORMANCE
TEST.
The troubleshooting is
are abnormal.
only an aid for isolating to a probable
The performance test setup is
5-36.
The flowcharts should be used in
fault.
shown in figure 5-4 and the performance
conjunction with the functional block
test is shown in figure 5-5.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |