| TM
11-5820-919-40-1
SECTION IV
PERFORMANCE TEST AND TROUBLESHOOTING
INTRODUCTION.
4-2. Once a fault has been isolated and
corrected, the performance test must be
4-14. The performance test and trouble-
shooting procedures are combined into a
repeated. Do not skip blocks in the per-
single flowchart format (chapter 3).
formance test, because succeeding blocks
This allows the maintenance technician
may be predicated on certain faults
being eliminated.
to check the radio set for normal indi-
cations, and to branch off for fault
isolation if an abnormal indication
RADIO SET PERFORMANCE TEST.
exists. The troubleshooting flowchart
4-16. The performance test setup is
is an aid for isolation to a probable
fault and should be used in conjunction
shown in figure 4-4 and the performance
with the functional block diagrams
test procedure is as shown in figure
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |