Click here to make tpub.com your Home Page

Page Title: Section IV. PERFORMANCE TEST AND TROUBLESHOOTING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM
11-5820-919-40-1
SECTION IV
PERFORMANCE TEST AND TROUBLESHOOTING
figure 4-1 and rf cabling diagram figure
INTRODUCTION.
4-2.  Once a fault has been isolated and
corrected, the performance test must be
4-14.  The performance test and trouble-
shooting procedures are combined into a
repeated.  Do not skip blocks in the per-
single flowchart format (chapter 3).
formance test, because succeeding blocks
This allows the maintenance technician
may be predicated on certain faults
being eliminated.
to check the radio set for normal indi-
cations, and to branch off for fault
isolation if an abnormal indication
RADIO SET PERFORMANCE TEST.
exists. The troubleshooting flowchart
4-16.  The performance test setup is
is an aid for isolation to a probable
fault and should be used in conjunction
shown in figure 4-4 and the performance
with the functional block diagrams
test procedure is as shown in figure
(chapter 2), power distribution diagram


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business