Click here to make tpub.com your Home Page

Page Title: Final Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM
11-5820-919-40-1
This
e.
Liquid  staking
used
where
3.
Disassembly
Inspection.
required.
visual  inspection  is  concerned
with  the  following  objectives.
f.
Correct  lubrication
used
where
required .
To  detect  frayed,  burnt,  short-
a.
ing,  or  broken  cables,  wiring,
and  dry-jointed,  shorted,  or
There  is  no  binding,  sticking,
g.
grounded  solder  connections.
or  looseness  of  moving  mechani-
cal  parts.
To  detect  blackened,
overheated,
b.
broken,  or  missing
h.
All  electrical/electronic  parts
electrical/electronic
components
are  correctly  orientated  for
and  parts.
clearances  and  lead  shortness.
Printed  circuit  boards  are  not
To  detect  missing  or  broken
c.
under  strain  due  to  Incorrect
hardware,  loose  mountings,  and
mounting.
missing
mechanical
parts.
d.
To  detect  mechanical  binding,
i.
No  short-circuits  or  grounds  are
sticking,  looseness,  and  exces-
caused by module case or cover.
sive wear of moving parts.
To  record  any  action  required  by
e.
FINAL
INSPECTION.
The  final
a.  thru  d.  above  including
inspection  may  be  divided
into  six  work
identification
of
replacement
areas  as  follows:
items  for  repair.
Reassembly  Inspection.  The  objec-
4.
1.
Final  mechanical  and  visual  inspec-
tive of this inspection is to
tion  of  each  module  following
avoid  malfunction  or  rework  after
reassembly.
The  inspection  areas
reassembly.
are  as  follows:
2.
Final  performance
test
for
each
observance  of  critical  posi-
a.
module
assembly.
tioning  or  adjustment  of  all
mechanical  and  electrical/
3.
Final  mechanical  and  visual  inspec-
electronic
parts.
tion  of  units  and  modules  follow-
ing  reassembly.
All
required  hardware
is
used
b.
and
correct.
4.
Final
performance
test
for
each
unit.
All required parts are used and
c.
correct.
Final
performance
tests
for
radio
5.
set.
d.
All  required  wiring,  soldering,
This
and  sleeving  is  correct.
6.
Documentation,  packaging,  and  ship-
includes  correct  "dressing'"
ping  inspection  for  the  complete
arrangement  of  wire  harnesses
AN/PRC-104,  as  applicable.
and  cables,  etc.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business