| |
TM 11-5820-890-30-5
4-26. REPLACEMENT OF CONNECTORS P2 AND P3. Continued
ITEM
ACTION
REMARKS
INSTALLATION
i.
j.
k.
l.
m.
n.
o.
Connectors P2 and P3
(1 and 2)
Wires
Connectors P2 and P3
(1 and 2)
Audio amplifier CCA (6)
Eight screws (4) and
flat washers (5)
Three screws (7), flat
washers (5), and cable
clamps (8)
Access cover (2)
Position replacement connector P2 or P3
to tagged wires.
Using soldering kit, solder tagged wires to
pins of replacement connector P2 or P3.
Remove wire tags. Replace insulation
sleeving.
Connect connector P2 or P3 to audio am-
plifier CCA connector J2 or J1 and tighten
two jackscrews.
Hold in place in audio amplifier chassis.
Using cross tip screwdriver, install and
tighten eight retained screws (4) and
flat washers (5) securing audio amplifier
CCA (6) to audio amplifier chassis (3).
Using cross tip screwdriver, install and
tighten three retained screws (7), flat
washers, and cable clamps (8) securing
audio amplifier CCA (6) to audio amplifier
chassis (3).
Install.
See figure 4-6.
Before and after soldering,
clean wires and pins with
alcohol and cotton swabs.
See figure 4-5.
These were removed
in step c.
These were removed
in step d.
See figure 4-5. This was
removed in step b.
Refer to paragraph 4-19 for
access cover installation
procedures.
4-114
|