Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPLACEMENT OF CONNECTORS J2 - J6. Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



TM 11-5820-890-30-5 4-22. REPLACEMENT OF CONNECTORS J2 - J6. Continued ITEM ACTION REMARKS REMOVAL Continued e.  Connectors  J2  -  J6  (1) f.   Wires   (6) INSTALLATION g.  Wires  (6) h.   Audio   amplifier   CCA   (6) Connectors i. J2  -  J6  (1) j. Protective  cap  (3) k. Access  cover  (2) Using  3/4-inch  spanner  wrench  and  span- ner  attachment,  remove  and  retain  span- ner  nut  (4)  and  internal-tooth  Iockwasher (2)   from   defective   connector.   Remove defective   connector   from   audio   amplifier chassis   (5). Remove  insulation  sleeving.  Using  soldering kit,  tag  and  desolder  wires  from  connector. Remove  and  discard  defective  connector. Using  soldering  kit,  solder  tagged  wires  to correct  pins  on  replacement  connector. Remove  wire  tags.  Replace  insulation sleeving. Install. Apply  silicone  compound  to  replacement connector  o-ring.  Position  connector  to audio  amplifier  chassis  (5).  Install  retained internal-tooth  Iockwasher  (2),  and  secure connector  with  spanner  nut  (4).  Using torque  wrench  and  spanner  attachment, torque  nut  to  87  to  93  in-lb. Install  on  replacement  connector. Install. Before  and  after  soldering, clean  wires  and  pins  with alcohol  and  cotton  swabs. Refer  to  paragraph  4-19 for   installation   procedures. These  were  removed  in step  e. See  figure  4-5.  This  was removed  in  step  b. Refer  to  paragraph  4-19  for access  cover  installation procedures. 4-23. REPLACEMENT OF ELECTRICAL BINDING POSTS E1A, E2A, E1B, AND E2B. Tools: Flat  tip  screwdriver Torque  wrench 5/16-inch   open-end   wrench Torque   screwdriver Soldering  kit Expendable  Supplies: Cotton  swabs Solder Alcohol References: Paragraph  4-19  for  removal  and  installation  of  access  cover. 4-109


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business