Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATIONAL CHECK. Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 



TM 11-5820-890-30-5 4-9. OPERATIONAL  CHECK.  Continued The operational check is divided into steps. Each step verifies a particular function. Follow the instruction in the “Action”  column.  Check  the  response.  If  the  response  is  correct,  proceed  with  the  next  lettered  step.  When  a Step has been completed, proceed with the next Step. A "No response" in  the  "Response"  column  means  that any  response  is  not  of  interest. The  switch  settings  for  the  test  equipment  are  given  in  the   “EQUIPMENT PRESETS” section of the test setup figure. Set the test equipment switches to the indicated presets and then verify the settings. If a test response is incorrect,  check  the  equipment  settings  and  the  test  adapter  cabling  before  going  to  a  troubleshooting  chart  or replacing  a  bad  module. High voltage (200 V dc) is present at mounting adapter connector J1. The large current capacity of the test power supply can cause personal injury. Use caution when connecting the test setup and  taking  measurements  to  avoid  personal  injury. Connect  equipment  as  shown  in  figure  4-2  to  perform  the  operational  check  of  the  mounting  adapter. 4-5


Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business