Click here to make tpub.com your Home Page

Page Title: CONDUCT COLD START NET OPENING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-890-10-8
RESULTS
ACTIONS
SUBTASKS
(20-30 seconds should be
(1)
Allow operators time to
d. Confirm receipt of ERF
adequate)
store the ERF
(NCS and operators continue
(2)
Direct operators to ACK
to use MAN in CT for ACK)
receipt of ERF
(Net shifts to the FH mode of
(1)
Direct operators to go to
communications)
SQ ON, operational chan
check
N/A
(2)
Set NCS radio to SQ ON
and operational chan
(Note which operators do not
(3) Check communications
respond)
with net operators
Cold Start is complete when all
(4)
Direct Alt NCS to bring
operators have entered net
all other operators into
net***
*
Sync time may be loaded into the radio from an ANCD, a PLGR, via ERF; or by use of the
RT keypad. The preferred method is to load exact GPS time and Julian Date directly form an
ANCD or PLGR.
**
Depending upon operational conditions and state of operator training, you may wish to
have operators acknowledge this announcement,
***
Ensure that operators understand that if they fail for any reason to enter the net at the
time the ERF is sent, they are to standby on MAN and wait for you to contact them there.
6-16


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business