Click here to make tpub.com your Home Page

Page Title: CUE and ERF Method
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-890-10-8
4.6e.
CUE and ERF Method
NOT SO EASY
The CUE and ERF method of late net entry does work, but it requires
much more of the operator than the other methods, described. It also
requires action on the part of the NCS or alternate NCS, and it involves
the use of SC transmissions with probable displacements following
each.
SITUATION
A situation in which an operator may find it necessary to use the CUE
and ERF method is when no net traffic is heard, data or sync time are
believed to be at fault, and neither an ANCD nor a PLGR is available for
reloading.
PROCEDURE
For the procedure to perform CUE and ERF method of late net entry,
see Figures 4-12 and 4-13, below, or Special Operator Task 5,
"Perform CUE and ERF Late Net Entry."
Load CUE and MAN frequencies into RT
(1)
Set CHAN to CUE, COMSEC to PT.
(2)
Press PTT for 5 seconds (no need to talk).
(3)
Set COMSEC to CT immediately.
(4)
Wait for NCS to respond (repeat steps (2)-(4)
(5)
every 15 seconds until a response is received.
Figure 4-12. OPERATOR'S CUE & ERF PROCEDURE
To respond to the operator's CUE and ERF request, the NCS or alternate NCS, follows the
procedure shown in Figure 4.13 (also see Primary NCS Task 5, "`Respond to CUE Calls":
Note "CUE" message in RT display.
(1)
Switch from operational channel to CUE.
(2)
Respond on CUE channel in CT mode.
(3)
Direct caller to MAN channel.
(4)
Upon caller's request, send ERF on MAN channel.
(5)
Return to operational channel, and check
(6)
Immediately displace to new location if enemy is
(7)
believed to have direction finding capabilities. (Alt
NCS normally responds to CUE calls to preclude
NCS displacement.)
Figure 4-13. NCS CUE & ERF PROCEDURE
4-21


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business