| TM 11-5820-695-35
d. Procedure
Step
Control Setting
No Test Equipment
Equipment Under Test
Test Procedure
Performance Standard
4 Same as step 1.
N/A
a. Remove the test
a. None.
lead from the
mount in the R-
1467(P)A/GRC-
144(V) SPECIAL
TOOLS AND SPARE
FUSES compartment
b. Set meter panel
b. None.
assembly 2A15A2
switch to the +
TEST position.
c. Connect probe
c. The test point
on one end of
meter indication
test to TEST
should be in the
LEAD jack on
yellow band
meter panel as-
30 to full
assembly 2A15A2
scale).
and connect
probe on other
end of test
lead to the CV-
3633/GRC-144(V)
3A5 TP3 PWR OUT
test point.
d. To calibrate the d. None.
forward power
threshold alarm,
perform the following steps:
(1) Using a small
tuning tool
turn the CV-
3633/GRC-144(V)
FWD PWR 3A1R2
screwdriver adjustment
control clockwise
if necessary until-
the status
panel ALARM SUM-
MARY indicator
is lit red.
(2) Return filter
1FL3 to 5000 MHz,
the SUMMARY ALARM
shall turn green.
Change 6
3-104.1/(3-104.2 blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |