Click here to make tpub.com your Home Page

Page Title: Procedure-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-695-35
d. Procedure
Step
Control Setting
No Test Equipment
Equipment Under Test
Test Procedure
Performance Standard
4 Same as step 1.
N/A
a. Remove the test
a. None.
lead from the
mount in the R-
1467(P)A/GRC-
144(V) SPECIAL
TOOLS AND SPARE
FUSES compartment
b. Set meter panel
b. None.
assembly 2A15A2
switch to the +
TEST position.
c.  Connect probe
c. The test point
on one end of
meter indication
test to TEST
should be in the
LEAD jack on
yellow band
meter panel as-
30 to full
assembly 2A15A2
scale).
and connect
probe on other
end of test
lead to the CV-
3633/GRC-144(V)
3A5 TP3 PWR OUT
test point.
d. To calibrate the d. None.
forward power
threshold alarm,
perform the following steps:
(1) Using a small
tuning tool
turn the CV-
3633/GRC-144(V)
FWD PWR 3A1R2
screwdriver adjustment
control clockwise
if necessary until-
the status
panel ALARM SUM-
MARY indicator
is lit red.
(2) Return filter
1FL3 to 5000 MHz,
the SUMMARY ALARM
shall turn green.
Change 6
3-104.1/(3-104.2 blank)


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business