Click here to make tpub.com your Home Page

Page Title: CHAPTER 4. CRYSTAL UNIT SET, QUARTZ CK-31/FRC-93
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-554-12
CHAPTER 4
CRYSTAL UNIT SET, QUARTZ CK-31/FRC-93
I F stages. The packet is a waterproof plastic material
4-1. Description
containing a pouch for each crystal and one for the
Crystal Unit Set, Quartz CK-31/FRC-93 (Collins
crystal grippers.  The complete packet may be
Crystal Packet CP-1) consists of a packet, a set of
snapped and strapped into the Collins CC-2 for
crystals for operation of the Collins KWM-2/2A over
transportation as part of a transportable station. The
their complete frequency range, and a set of crystal
folded packet is shown in figure 4-1 The unfolded
grippers for use in installing and removing crystals
packet showing grippers and the individual pouches
from the equipment. The crystals not supplied are
for the crystals is shown in figure 4-2. Each crystal
those for the range of 5.0 to 6.6 MHz. Operation
pouch is marked with appropriate band information
between 5.0 and 6.6 MHz is not desirable because of
and crystal frequency.
spurious responses of the equipment due to the second
harmonics of the variable
Figure 4-1. Crystal packet, folded.
4-2. Use
used. Remove the desired crystal from its pouch, grip
Unlock the crystal grippers, and grasp the crystal in
with the tool, and insert it in the socket determined by
the equipment with them. Figure 4-3 shows a crystal
gripped the proper way. Apply enough pressure on
4-3. Operator's Maintenance Instructions
the grippers to prevent slipping, and pull the crystal
from its socket. Place the crystal in the pouch marked
Other than keeping the pouch free of dust, no regular
for it with the pins showing from the open end. Refer
operator's maintenance is required.  Organizational
to table 3-2 to determine the proper crystal for the
maintenance
is
required.
frequency band to be
4-1


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business