| TM 11-5820-509-35
Figure 6-10. Test Fixture for C-4311/PRC-47, Suggested Layout.
subassemblies of the radio set to determine whether the
6-3. Test Facilities
defective circuit has been repaired. If doubt arises as to
A primary power source of 115 volts, 400-Hz, single-
the completeness of the repair procedures, a limited
phase alternating current at approximately 3.0 amperes,
number of performance standards tests will verify circuit
and a 26.6-volt direct current primary power source at
performance.
approximately 16 amperes is required for these tests. In
addition, normal test instrument primary power facilities
6-6. Reference Standards Tests
(60- or 400- Hz) will be required. The test fixtures, or
The following reference standards tests are required to
their equivalent, shown in figures 6-4 through 6-10, will
provide
assurance
that
satisfactory
operating
be required.
parameters have been maintained or restored as a
result of depot overhaul procedures. Each group of
6-4. Modification Work Orders
tests, performed on a specific modular subassembly, is
The performance standards listed in the following tests
conducted using the test fixture for that module together
assume that all modification work orders (MWO's) have
with the equipment configuration specified in the
been performed. Consult DA Pam 310-7 for a list of
procedure.
Certain initial conditions must be
MWO's for Radio Set AN/PRC-47.
established before the performance tests and reference
standards can be judiciously compared.
Unless
6-5. Physical Tests and Inspection
specified, all tests shall be performed in the order listed
Perform
general
inspection
of
all
modular
in the procedures to avoid ambiguity.