Click here to make tpub.com your Home Page

Page Title: Power Amplifier Load and Tune Mechanism
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-509-35
NOTE
(b) Withdraw panel bushings (9) and
Carefully rotate the heatsink around
(28) from the front panel. Use care so that gaskets (10)
the axis of the power amplifier tube
and (29) and nylon sleeve bearings (69) and (95) are not
until its mounting holes match the
lost or damaged.
holes in the front panel of the
receiver-transmitter.
NOTE
Be sure that washers (67) and (100)
remain on the shafts of inductors
(3) Thread the plate cap and its lead through
(64) and (101) respectively.
the clearance hole in the heat sink and carefully attach it
to the plate electrode.
(7) Unsolder and tag the two insulated bus
(4) Position the overtemperature cutout on
wires that connect to lower front contact spring
the heat sink and carefully secure it in place with the two
assembly (74).
4-40 x 1/8 pan head screws.
(8) Carefully remove roller contacts (41),
(5) Orient the access hole cover and its
(56), (82), and (91) and their associated rods (42), (51),
gasket on the opening in the front panel of the RT-
(79), and (92) by removing 0-80 x 1/8 round head
671/PRC-47 and secure them in place with the four 8-32
screws (38), (44), (49), (57), (76), (85), (901 and (94)
x 1/2 flat head screws.
and their associated washers.
NOTE
(9) Remove E-ring (98) and spur gear (96)
This cover should be positioned so
from stub shaft (97).
that the attached chart can be easily
(10) Perform the procedures of paragraph 3-19
read.
a and carefully remove the front panel of the receiver-
transmitter so that sleeve bearings (35), (48), (69), and
(95) remain on their respective shafts.
(6) Replace the bottom cover on the power
amplifier compartment and secure it in place with the 4-
(11) If dial stop (14), support plate (12), lower
40 x 1/4 pan head screws.
front mounting block (73) or lower front contact spring
assembly (74) are defective, remove them as follows:
3-15. Power Amplifier Load and Tune Mechanism
(a) Remove lower front contact spring
(fig-3-89)
assembly (74) from lower front mounting block (73) by
CAUTION
removing 6-32 x 1/4 net head screws (77) and (78).
Disassemble
the
load-tune
(b) Remove the dial stop assembly and
mechanism  only  to  the  extent
lower front mounting block (73) from the panel of the
necessary to affect repairs.
Use
receiver-transmitter by removing 6-32 x 7/16 flat head
extreme care to avoid damage or
screw (13) and stud (18).
misalignment
of
roller
spring
assemblies 139), (45), (60), 174), (86),
NOTE
and 188).
If either dial stop (14) or support
plate (12) is defective, replace this
a. Disassembly Procedures.
assembly as a unit.
(1) Loosen and remove the 4-40 x 1/4 screws
(11 per cover) that secure the top and bottom covers to
(12) If upper front contact spring assembly (45)
the power amplifier compartment; remove both covers.
or upper front mounting block (46) is defective, proceed
(2) Remove E-ring (17) from its groove in the
as follows:
shaft of LOCK knob (15) and unscrew the knob from
(a) Remove the four 4-40 x 1/2 pan
stud (18). Open dial stop (14).
head screws that secure XMTR OUTPUT meter to the
(3) Loosen setscrews (2) and (20) and
front panel of the receiver-transmitter.
Carefully
remove POWER AMPLIFIER LOAD control knob (1)
withdraw the meter so that its gasket is not damaged.
and POWER AMPLIFIER TUNE control knob (21) from
Do not unsolder the meter leads.
their respective shafts.
(b) Remove 6-32 x 5/16 flat head
(4) Remove screws 14), (5), (23), and (24);
screws (31) and (32) that secure upper front mounting
then remove pointers (6) and (25). Withdraw primary
block (46) and upper front contact spring assembly (45)
scales (3) and (22) from collars (7) and (26).
to meter shield (33).
(5) Loosen and remove collars (7) and (26);
(c) Carefully  remove  upper  front
then remove secondary scales (8) and (27).
contact spring assembly (45) from upper front mounting
block (46) by removing 6-32 x 1/4 flat head screws (52)
(6) If panel bushings (9) and (28) are
and (53).
defective, remove them from the front panel of RT-
671/PRC-47 as follows:
(d) Remove meter shield (33) from the
(a) Loosen and remove hex nuts (68)
and (99).
3-104


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business