Click here to make tpub.com your Home Page

Page Title: TEST SETUP
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-401-34-3/0967-LP-432-3060
SILICON VERSION A5200A SQUELCH AMPLIFIER ALINEMENT, OLD SQUELCH LEVEL. (CONT)
5-28.
TEST EQUIPMENT AND MATERIALS
Matching Unit CN-901/U
Signal Generator AN/URM-103
T-Connector UG-274/U
Frequency Counter AN/USM-207
Loudspeaker LS-454/U
Power Supply PP-1104(*)/G
Voltmeter ME-30(*)/U
Test Cable No. 1
Signal Generator AN/URM-127
TEST SETUP. Connect the equipment as shown in test setup diagram
. Remove R-442/VRC top
cover. (See paragraph 2-7.)
INITIAL EQUIPMENT CONTROL SETTINGS. Set equipment controls as indicated in the following
table. When using alternate equipment, inject 20-v rf at 64 MHz, 7.3-kHz modulation; deviation as
per alinement requirements.
CONTROL AND SWITCH SETTINGS
POSITION/SETTING
CONTROL OR SWITCH
EQUIPMENT
ON-RESET
POWER
R-442/VRC
Follow instructions in alinement procedure
BAND
Follow instructions in alinement procedure
MC-TUNE-KC
Fully clockwise
VOLUME
OLD ON
SQUELCH
5-128


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business