|
| TM 11-5820-401-34-3/0967-LP-432-3060
5-22. SILICON VERSION AUDIO AND SQUELCH PREAMPLIFIER A4300A ALINEMENT. (CONT)
1. Turn AN/URM-103 DEVIATION control clockwise until DEVIATION KHZ meter reads 8 kHz.
2. Set ME-30(*)/U to 1-volt scale.
3. Lift A4000 tray (1). (See test setup diagram
4. Remove A4300A cover (2).
5. Connect ME-30(*)/U positive lead to TP4007 (3) and negative lead to ground.
6. Adjust R4304 (4) for 0.8-vac reading on ME-30(*)/U.
5-23. A5300 SQUELCH FILTER ALINEMENT.
PURPOSE. This procedure adjusts the gain of Squelch Amplifier A5200 in the NEW SQUELCH mode
of operation. By adjusting Resistor R5301 in the squelch filter, the filter is properly tuned to attenuate
the 150-Hz squelch tone, thus providing maximum degenerative feedback to the squelch amplifier for
all frequencies other than 150 Hz. This permits the squelch amplifier to provide maximum gain for 150-
Hz signals. Alinement of the A5300 squelch filter must be done before the A5200 Squelch Amplifier
Alinement, NEW SQUELCH Level, paragraph 5-25.
TEST EQUIPMENT AND MATERIALS
Matching Unit CN-901/U
Signal Generator AN/URM-103
T-Connector UG-274/U
Signal Generator AN/URM-127
Loudspeaker LS-454/U
Power Supply PP-1104(*)/G
Voltmeter ME-30(*)/U
Frequency Counter AN/USM-207
Test Cable No. 1
TEST SETUP. Connect the equipment as shown in test setup diagram
. Remove
R-442/VRC top cover. (See paragraph 2-7.)
5-112
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |