Click here to make tpub.com your Home Page

Page Title: FOLLOW-ON MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5820-401-34-3/0967-LP432-3060
2-9.
A1000 ASSEMBLY REPLACEMENT. (CONT)
5. Carefully place A1000 assembly (5) on captive nut towers (6) and aline gear train couplers
(7), linkage arm (8), and BAND switch cam (9).
6. Handtighten three captive nuts (10).
CAUTION
Care must be taken when performing next step to prevent damage to vhf tuner linkage
arm (8).
7. Using wrench, carefully tighten three captive nuts (10).
8. Connect brown wire (W102) (11) to J1001.
9. Connect six color-coded wire plugs (12).
FOLLOW-ON MAINTENANCE: Install front panel. (See paragraph 2-8.)
2-17


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business