• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 1. INTRODUCTION
CHAPTER 3. COMPLETION TIME FOR INSTALLATION

Sincgars An/Vrc-88F, An/Vrc-89F, An/Vrc-90F, An/Vrc-91F, An/Vrc-92F Force Xxi Battle Command, Brigade-And-Below (Fbcb2) An/Uyk-128(V) Defense Advanced Gps Receiver (Dagr) An/Psn-13 Vehicular Intercommunication Set (Vis) An/Vic-3(V)20 Blue Force Tracking (Bft) Enhanced Position Location Reporting System (Eplrs) An/Vqz-2(V) For Vehicle Truck, Utility: Expanded Capacity, Enhanced, Iap/Armor Ready, M1152A1 (2320-01-540-2007) Page Navigation
  1  2  3    4    5    6    7  
TB 9-2320-387-35-7
CHAPTER 2
PURPOSE OF INSTALLATION
The purpose of installing the C4ISR equipment is to provide the primary means of integrating command
and control capability.
2-1/(2-2 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.