|
| TB 9-2320-387-35-5
22-49. Route all cables (77) forward from step 22-28 through cargo access hole (79) and in between
tunnel (80) and right rear seat (78).
78
79
~
77
80
Figure 5-91.
NOTE
Perform steps 22-50 and 22-51 if supplemental heater is not
installed. Perform 22-52 and 22-53 if supplemental heater is
installed.
Do not route TAC-SAT or HF radio speaker cables through
tunnel.
22-50. Locate, mark, and drill three 0.147-in. diameter holes (81) in side of tunnel (80), evenly spaced
apart.
22-51. Secure cables (77) to side of tunnel (80) with three clamps (82) and self-tapping screws (83).
22-52. Locate, mark, and drill two 0.147-in. diameter holes (81) in side of tunnel (80), evenly spaced apart.
22-53. Secure all cables (77) to side of tunnel (80) with two loop clamps (82) and self-tapping screws (83),
and clamp (82), existing bracket (85), and screw (84).
80
81
81
80
~
81
~
77
82
83
82
82
77
82
83
83
84
83 85
82. LOOP CLAMP MS21333-75 QTY. 3
83. SELF-TAPPING SCREW 9421073 QTY. 2
Figure 5-92.
5-67
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |