Click here to make tpub.com your Home Page

Page Title: Route power cable
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-387-35-3
NOTE
Loosen right-side tunnel insulation before performing step 17-7.
(Refer to TM 9-2320-387-24.)
17-7. Route power cable (27) under right-side tunnel insulation (28) towards terminal board. (Refer to
17-8. Attach heat shrink tubing (17) and two terminal lugs (15) and (21 to power cable negative lead (20)
and power cable positive lead (18). (Refer to TM 9-2320-387-24 for terminal connector repair.)
17-9. Connect power cable positive lead (18) to 24V terminal board (23) located on cab enclosure
panel (14) with existing nut (16).
17-10. Connect power cable negative lead (20) to ground strap (22) located on cab enclosure panel (14)
with existing nut (16). Secure leads together with tiedown strap (19).
17-11. Secure right-side tunnel insulation. (Refer to TM 9-2320-387-24.)
15
16
17
18
14
~
19
23
22
16
21
17
25
15.
TERMINAL LUG 7728780 QTY. 1
17.
SHRINK TUBING MS23053/4-302-0 QTY. A/R
19.
TIEDOWN STRAP MS3367-1-0 QTY. A/R
21.
TERMINAL LUG 7728777 QTY. 1
Figure 5-63.
5-48
Change 1


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business