Click here to make tpub.com your Home Page

Page Title: Section XIII. PLGR POWER CABLE INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-387-35-3
Section XIII. PLGR POWER CABLE INSTALLATION
13-1. Route PLGR power cable (2) from PLGR assembly (1) to B-beam (3).
1
2
3
2
2. PLGR POWER CABLE 9728558-10 QTY. 1
Figure 5-42.
13-2. Attach shrink tubing (7) and terminal lugs (5) and (11) to PLGR power cable negative lead (10) and
PLGR power cable positive lead (8). (Refer to TM 9-2320-387-24 for terminal connector repair.)
13-3. Attach PLGR power cable positive lead (8) to 24-volt terminal board stud (4) with existing nut (6).
13-4. Attach PLGR power cable negative lead (10) to ground strap stud (12) with existing nut (9).
13-5. Coil excess power cable (2) under integrated rack (13) and secure with clamp (14), screw (17), and
nut (16). Secure power cable (2) with tiedown straps (15) as necessary.
13
5
6
7
17
4
8
16
2
11
12
7
10
9
5. TERMINAL LUG 7728780 QTY. 1
15
14
7. SHRINK TUBING MS23053/4-302-0 QTY. A/R
11. TERMINAL LUG 7728777 QTY. 1
14. TIEDOWN STRAP MS3367-7-0 QTY. A/R
Figure 5-43.
Figure 5-43.1.
Change 1


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business