| 
 | ||||||||||
| 
 |  TB 9-2320-387-35-3 Section XIII. PLGR POWER CABLE INSTALLATION 13-1. Route PLGR power cable (2) from PLGR assembly (1) to B-beam (3). 1 2 3 2 2. PLGR POWER CABLE  9728558-10  QTY. 1 Figure 5-42. 13-2. Attach shrink tubing (7) and terminal lugs (5) and (11) to PLGR power cable negative lead (10) and PLGR power cable positive lead (8). (Refer to TM 9-2320-387-24 for terminal connector repair.) 13-3. Attach PLGR power cable positive lead (8) to 24-volt terminal board stud (4) with existing nut (6). 13-4. Attach PLGR power cable negative lead (10) to ground strap stud (12) with existing nut (9). 13-5. Coil excess power cable (2) under integrated rack (13) and secure with clamp (14), screw (17), and nut (16). Secure power cable (2) with tiedown straps (15) as necessary. 13 5 6 7 17 4 8 16 2 11 12 7 10 9 5. TERMINAL LUG  7728780  QTY. 1 15 14 7. SHRINK TUBING  MS23053/4-302-0  QTY. A/R 11. TERMINAL LUG  7728777  QTY. 1 14. TIEDOWN STRAP  MS3367-7-0  QTY. A/R Figure 5-43. Figure 5-43.1. Change 1 | 
| 
 Privacy Statement - Press Release - Copyright Information. - Contact Us |