7-8. Install W3 cable (16) to Serial Interface Adapter Device (SIAD) (17).
7-9. Install W3N cable (14) to SIAD (17).
7-10. Install W3P cable (15) to SIAD (17).
7-11. Install SIAD (17) on integrated rack (6) using two screws (13), lockwashers (12), and washers (11).
6
11.
WASHER MS27183-47 QTY. 2
12.
LOCKWASHER MS35338-43 QTY. 2
13.
SCREW MS35207-263 QTY. 2
11
14.
W3N CABLE 881336-1 QTY. 1
15.
W3P CABLE 881335-1 QTY. 1
12
16.
W3 CABLE P/O 881331-1 QTY. 1
17.
SIAD 881331-1 QTY. 1
13
17
14
16
15
Figure 5-21.
7-12. Fabricate ground strap (23) from 8.00-in. length of braided wire and two terminal lugs.
NOTE
Perform step 7-13 if blast shield is installed.
Perform step 7-14 if blast shield is not installed.
7-13. Install rack support (1) on blast shield (4) and tunnel (5) with three capscrews (21), lockwashers (19),
washers (20), and ground strap (23), and three existing capscrews (18), lockwashers (19), washers (20),
and spacers (22). Do not tighten capscrews (21) and (18) at this time.
18
20
19
19
20
21
1
18.
CAPSCREW B1821BH025C150N QTY. 3
19
19.
LOCKWASHER MS35338-44 QTY. 6
20
19
20.
WASHER 2436161 QTY. 6
20
21.
CAPSCREW B1821BH025C100N QTY. 3
22.
SPACER 5579297 QTY. 3
23.
GROUND STRAP
21
19
BRAIDED WIRE AA59569F30T0375 QTY. A/R
19
20
TERMINAL LUG MS20659-141 QTY. 2
5
20
23
4
22
Figure 5-22.
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |