27-1. Remove two screws (2), nuts (4), and clamps (1) from A-frame pillar flange (5). Retain hardware. 
27-2. Locate and mark cutout area (3) on A-frame pillar flange (5). 
27-3. Cut out area (3) of A-frame pillar flange (5). Use fine-mill file or crocus cloth to remove all burrs 
and sharp edges. 
CENTERLINE 
OF VEHICLE 
2 
1 
2 
3 
1 
7.62 
~ 
6.50 
4 
00 
1. 
5 
4 
Figure 5-89. 
 | 
| 
 