Click here to make tpub.com your Home Page

Page Title: CHAPTER 1. INTRODUCTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-280-35-6
INTRODUCTION
Section I. SCOPE
1-1. This technical bulletin provides installation instructions for Command, Control, Communications,
Computers, Intelligence, Surveillance, and Reconnaissance (C4ISR) equipment. The C4ISR equipment
shall be installed in the following vehicles:
a. Truck, Utility, 4-Door: Armament Carrier, Armored, 1-1/4 Ton, 4x4, M1025, M1025A1, M1025A2
b. Truck, Utility, 4-Door: Armament Carrier, Armored, 1-1/4 Ton, 4x4, M1026, M1026A1
1-2. The information contained in this technical bulletin is the official authorization to perform the
installation of the C4ISR equipment at the direct support maintenance level through contract
maintenance teams.
Section II. NOTES
2-1. This technical bulletin is not an authorization for requisition or turn-in of vehicles.
2-2. This technical bulletin does not establish quantity or types of vehicles assigned to using units.
Section III. GENERAL INFORMATION
3-1. Included in the C4ISR equipment are:
a. Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F, AN/VRC-89F,
AN/VRC-90F, AN/VRC-91F, AN/VRC-92F
b. Force XXI Battle Command, Brigade-and-Below (FBCB2) AN/UYK-128 (V)4
c. Precision Lightweight Global Positioning System Receiver (PLGR) AN/PSN-11
d. Enhanced Position Location Reporting System (EPLRS) AN/VSQ-2(V)
e. Driver's Vision Enhancer (DVE) AN/VAS-5A
f. Additional terminal boards
3-2. The C4ISR equipment becomes operable when all the components are installed in the vehicle and
correct power is supplied.
Section IV. MAINTENANCE FORMS, RECORDS, AND REPORTS
Use the following to report any discrepancies:
a. Reports of Maintenance and Unsatisfactory Equipment. See chapter 4, sections VI through VIII for
information.
b. Reports of Packaging and Handling Deficiencies. See chapter 4, sections VI through VIII for
information.
Section V. CONSOLIDATED INDEX OF ARMY PUBLICATIONS
Refer to the latest issue of DA PAM 25-30 to determine whether there are new changes or additional
publications pertaining to the C4ISR equipment.
1-1/(1-2 blank)


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business