Click here to make tpub.com your Home Page

Page Title: Section XXV. MTS PLGR POWER CABLE INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-280-35-3
Section XXV. MTS PLGR POWER CABLE INSTALLATION
25-1. Position PLGR power cable (4) on PLGR mount (1).
25-2. Route PLGR power cable (4) to battery box and secure with loop clamp (8) and existing screw (5),
lockwasher (6), washer (7), spacer (9), loop clamp (3), and existing screw (2).
2
3
4
1
5
3. LOOP CLAMP MS21333-67 QTY. 1
4. PLGR POWER CABLE 9728558-10 QTY. 1
6
8. LOOP CLAMP MS21333-98 QTY. 1
7
8
9
Figure 5-80.
25-3. Attach shrink tubing (13) and two terminal lugs (11) and (17) to PLGR power cable negative
lead (16) and PLGR power cable positive lead (14). (Refer to TM 9-2320-280-20 for terminal
connector repair.)
25-4. Attach PLGR power cable positive lead (14) to 24V terminal board (10) with existing nut (12).
25-5. Attach PLGR power cable negative lead (16) to ground strap (18) with existing nut (12).
25-6. Secure all leads together with tiedown strap (15).
25-7. Secure right-side tunnel insulation. (Refer to TM9-2320-280-20.)
25-8. Coil excess cable and store under integrated rack.
13
12
11
14
15
10
18
17
16
12
13
11. TERMINAL LUG 7728780 QTY. 1
15. TIEDOWN STRAP MS3367-1-0 QTY. A/R
14. SHRINK TUBING MS23053/4-302-0 QTY. A/R
17. TERMINAL LUG 7728777 QTY. 1
Figure 5-81.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business