|
| TB 9-2320-280-35-3
NOTE
PLGR power cable positive lead insulation is ribbed.
15-24. Attach shrink tubing (38) and terminal lugs (36) and (42) to PLGR power cable negative lead (41)
and PLGR power cable positive lead (39). (Refer to TM 9-2320-280-20 for terminal connector repair.)
15-25. Attach PLGR power cable positive lead (39) to 24V terminal board (44) located on cab enclosure
panel (45) with existing nut (37).
15-26. Attach PLGR power cable negative lead (41) to ground strap (43) located on cab enclosure
panel (45) with existing nut (37).
15-27. Coil excess positive and negative power leads, place beneath ground strap (43), and secure with
tiedown strap (40).
NOTE
Ensure all excess antenna cable is inside cab of vehicle.
15-28. Coil excess antenna cable and store under integrated rack using tiedown strap (40) as necessary.
(Refer to figure 5-49.)
15-29. Install right-side tunnel insulation (34). (Refer to TM 9-2320-280-20.)
37
36
38
45
34
39
40
~
44
43
37
42
41
38
36.
TERMINAL LUG 7728780 QTY. 1
38.
SHRINK TUBING MS23053/4-302-0 QTY. A/R
40.
TIEDOWN STRAP MS3367-1-0 QTY. A/R
42.
TERMINAL LUG 7728777 QTY. 1
Figure. 5-50.
5-38
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |