|
| TB 9-2320-280-35-3
Section VII. INTEGRATED RACK INSTALLATION
NOTE
It is necessary to drill all holes for mounting MTS to tunnel before
installing integrated rack.
Perform steps 7-1 through 7-5 only when installing MTS.
Remove left-side tunnel insulation. (Refer to TM 9-2320-280-20.)
7-1. Drill out rivet from floor (4), enlarge hole (3) to 0.390-in. diameter, and install screw thread
insert (5) in floor (4).
NOTE
Ensure all holes are located on flat surface of tunnel ribs.
7-2. Using MTS mounting base bracket as template, locate, mark, and drill three 0.390-in. diameter
holes (2) in floor (4).
7-3. Using control box as template, locate, mark, and drill four 0.390-in. diameter holes (1) in floor (4).
7-4. Install seven screw thread inserts (5) in floor (4).
7-5. Install left-side tunnel insulation. (Refer to TM 9-2320-280-20.)
2
4.00
1
3
4.88
~
4
5
5. INSERT 12446871-2 QTY. 8
Figure 5-16.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |