|
| TB 9-2320-280-35-2
Section XXV. MTS PLGR POWER CABLE INSTALLATION
25-1. Position PLGR power cable (4) on PLGR mount assembly (1).
25-2. Route PLGR power cable (4) to battery box with loop clamp (8) and existing screw (5), lockwasher (6),
washer (7), spacer (9), loop clamp (3), and existing screw (2).
2
3
4
1
5
6
3. LOOP CLAMP MS21333-67 QTY. 1
7
4. PLGR POWER CABLE 9728558-10 QTY. 1
8
9
8. LOOP CLAMP MS21333-98 QTY. 1
Figure 5-87.
25-3. Attach shrink tubing (13) and two terminal lugs (11) and (17) to PLGR power cable negative
lead (16) and PLGR power cable positive lead (14). (Refer to TM 9-2320-280-20 for terminal
connector repair.)
25-4. Attach PLGR power cable positive lead (14) to 24V terminal board (10) with existing nut (12).
25-5. Attach PLGR power cable negative lead (16) to ground strap (18) with existing nut (12).
25-6. Secure all leads together with tiedown strap (15).
12
13
11
14
15
10
18
16
13
17
12
11. TERMINAL LUG 7728780 QTY. 1
15. TIEDOWN STRAP MS3367-1-0 QTY. A/R
14. SHRINK TUBING MS23053/4-302-0 QTY. A/R
17. TERMINAL LUG 7728777 QTY. 1
Figure 5-88.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |