|
| TB 9-2320-280-35-2
NOTE
Loosen right side tunnel insulation before performing step 19-6.
(Refer to TM 9-2320-280-20.)
19-6. Route power cable (27) under right side tunnel insulation towards terminal board. (Refer to
19-7. Attach heat shrink tubing (17) and two terminal lugs (15) and (21) to power cable negative lead
(20) and power cable positive lead (18). (Refer to TM 9-2320-280-20 for terminal connector repair.)
19-8. Connect power cable positive lead (18) to 24-volt terminal board (23) located on cab enclosure panel
(14) with existing nut (16).
19-9. Connect power cable negative lead (20) to ground strap (22) located on cab enclosure panel (14)
with existing nut (16). Secure leads together with tiedown strap (19).
19-10. Secure right side tunnel insulation. (Refer to TM 9-2320-280-20.)
15
16
17
14
18
19
~
23
22
16
21
20
17
15.
TERMINAL LUG 7728780 QTY. 1
17.
SHRINK TUBING MS23053/4-302-0 QTY. A/R
19.
TIEDOWN STRAP MS3367-1-0 QTY. A/R
21.
TERMINAL LUG 7728777 QTY. 1
Figure 5-64.
5-48
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |