|
| TB 9-2320-280-35-13
23-8. Locate, mark, and drill one 0.225-in. hole (22) in inboard corner on rear inside lip of left rear seat
back support (19).
23-9. Locate, mark, and drill two 0.147-in. holes (24) in front face of left rear wheelhouse (17).
23-10. Route cables (16), (1), and (4) along rear perimeter of left rear seat back support (19), up front face
of left rear wheelhouse (17), and under antenna base (30).
23-11. Secure cables (16), (1), and (4) to left rear wheelhouse (17) with screw (23), lockwasher (21), nut
(20), two self-tapping screws (18), two existing screws (14), and five loop clamps (15).
23-12. Route cables (1) and (4) to EPLRS mount (32)
23-13. Secure antenna cable (16) to antenna base (30) with existing loop clamps (29), screws (25),
washers (26), lockwashers (27), and nuts (28).
23-15. Take all slack out of cable and store under EPLRS mount assembly.
23-16. Tighten all screws and nuts on all clamps.
23-17. Secure right-side tunnel insulation. (Refer to TM 9-2320-280-20.)
5-72
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |