Click here to make tpub.com your Home Page

Page Title: Section XVI. PLGR BRACKET INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-280-35-13
Section XVI. PLGR BRACKET INSTALLATION
16-1. Install PLGR bracket (10) on integrated rack (12) with four screws (11).
16-2. Locate, mark, and drill one 0.201-in. diameter hole (8) in right-side engine tunnel (9).
16-3. Remove paint from vicinity of hole (1) on integrated rack (12) and hole (8) on right-side engine
tunnel (9). Apply anti-seize compound as required.
16-4. Fabricate ground strap (5) from 8.00-in. length of braided wire and two terminal lugs.
16-5. Install ground strap (5) on integrated rack (12) with capscrew (6), two lockwashers (4),
lockwasher (2), and nut (3).
16-6. Install ground strap (5) on right-side engine tunnel (9) with self-tapping screw (7) and two
5
4
4
6
4
3
7
2
1
12
8
9
10
2.
LOCKWASHER MS35338-44 QTY. 1
3.
NUT 9419143 QTY. 1
11
4.
LOCKWASHER MS45904-68 QTY. 4
5.
GROUND STRAP
BRAIDED WIRE AA59569F30T0375 QTY. A/R
TERMINAL LUG MS20659-129 QTY. 2
6.
CAPSCREW B1821BH025C100N QTY. 1
7.
SELF-TAPPING SCREW 9426241 QTY. 1
10.
PLGR BRACKET 986-0645-001 QTY. 1
11.
SCREW MS35206-263 QTY. 4
Figure 5-60.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business