|
| TB 9-2320-280-35-1
Section XXIX. DVE POWER CABLE INSTALLATION
NOTE
Previously routed cables have been removed for clarity.
29-1. Route DVE power cable (2) from DCM mount (1) to center of windshield center support (15), along
plenum (9), and under tunnel insulation (14) to rear of battery box.
29-2. Attach shrink tubing (22) and two terminal lugs (21) and (25) to DVE power cable negative
lead (24) and DVE power cable positive lead (23). (Refer to TM 9-2320-280-20 for terminal connector
repair.)
29-3. Attach DVE power cable positive lead (23) to 24V terminal board (27) with existing nut (20).
29-4. Attach DVE power cable negative lead (24) to ground strap (26) with existing nut (28).
29-5. Secure all leads together with tiedown strap (8).
29-6. Remove two existing screws, lockwasher, and washers from DCM mount (1) and windshield
frame (7).
29-7. Secure two cables (2) and (18) to windshield frame (7) with clamp (19) and screw (17).
29-9. If required, locate, mark, and drill 0.147-in. diameter hole (3) in windshield frame (7).
29-10. Secure two cables (2) and (18) to windshield frame (7) with clamp (16) and screw (17).
29-11. Remove screw (5) and clamp (6) from windshield wiper bracket (4).
29-12. Secure two cables (2) and (18) to windshield wiper bracket (4) with existing clamp (6) and existing
screw (5).
29-13. Secure two cables (2) and (18) to existing cables with tiedown straps (8).
29-14. Secure cabling to plenum (9) with clamps (11) and self-tapping screws (12).
29-15. Install right side tunnel insulation. (Refer to TM 9-2320-280-20.)
29-16. Install batteries. (Refer to TM 9-2320-280-20.)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |