Click here to make tpub.com your Home Page

Page Title: Section XXI. PLGR ANTENNA AND CABLE INSTALLATION WITH MTS (WITHOUT BOLT-ON ARMOR)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-280-35-1
Section XXI. PLGR ANTENNA AND CABLE INSTALLATION WITH MTS
(WITHOUT BOLT-ON ARMOR)
NOTE
Perform this procedure only when installing additional PLGR
antenna when MTS is installed.
Drilled holes on inside and outside of windshield frame should be
in alignment with each other to allow routing of PLGR cable
through windshield frame.
Relocate all caution labels as necessary.
21-1. Using PLGR antenna mount bracket as template, locate, mark, and drill two 0.50-in. holes (3) in
outer windshield frame (1).
21-2. Locate, mark, and drill 0.375-in. diameter hole (2) in outer windshield frame (1).
2
1
3
3
0.75
3.00
Figure 5-67.
21-3. Locate, mark, and drill 0.375-in. diameter hole (4) in left side inner windshield frame (5).
4
5
1.25
~
5.12
Figure 5-68.
Change 1


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business