|
| TB 9-2320-280-35-1
NOTE
Perform step 13-35 for AN/VRC-92F only.
Ensure all excess cable is inside cab of vehicle.
13-35. Coil all excess cable, secure with tiedown strap (40) and place under right side tunnel
insulation (37).
13-36. Install right side tunnel insulation (37). (Refer to TM 9-2320-280-20 or TM 9-2320-387-24.)
40
37
40. TIEDOWN STRAP MS3367-1-0 QTY. A/R
Figure 5-42.
5-35
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |