Click here to make tpub.com your Home Page

Page Title: Section XII. PLGR BRACKET INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-280-35-1
Section XII. PLGR BRACKET INSTALLATION
NOTE
Perform steps 12-1 through 12-4 for AN/VRC-92F only.
Tiedown anchors may not be installed. If tiedown anchors are not
installed, use existing hole for measurements in step 12-1.
Ensure mounting holes for PLGR bracket are completely on flat
surface of cargo floor raised rib.
12-1. Using PLGR mount (1) as template, mark and drill two 0.390-in. diameter holes (5) in cargo
floor (7).
12-2. Install two inserts (6) in holes (5) in cargo floor (7).
12-3. Attach PLGR mount (1) to cargo floor (7) with two capscrews (2), lockwashers (3), and washers (4).
12-4. Install PLGR bracket (10) on mount (1) with four screws (11), lockwashers (9), and plain-assembled
nuts (8).
2
8
3
4
9
10
1
7.50
~
1.50
1
5
6
7
11
8.
PLAIN-ASSEMBLED NUT 9422771 QTY. 4
1.
PLGR MOUNT 12480576 QTY. 1
9.
LOCKWASHER MS35338-43 QTY. 4
2.
CAPSCREW B1821BH025C100N QTY. 2
10.
PLGR BRACKET 986-0645-001 QTY. 1
3.
LOCKWASHER MS35338-44 QTY. 2
11.
SCREW MS35206-264 QTY. 4
4.
WASHER 2436161 QTY. 2
6.
INSERT 12446871-2 QTY. 2
Figure 5-30.
Figure 5-31.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business