|
| TB 11-5820-890-12
PREVENTIVE MAINTENANCE CHECKS AND SERVICE FOR ANCD
2-6. OPERATION UNDER USUAL CONDITIONS - ASSEMBLY AND PREPARATION FOR USE.
Unpacking/Repacking. Use the following procedure to unpack the ANCD. When repacking is necessary, reverse
the unpacking procedure.
NOTE
Prior to unpacking the equipment, check the carton for breaks, which may indicate possible interior
damage. If damage is found, report the damage on an SF 361, Transportation Discrepancy Report, as
directed in AR 55-38, Reporting of Transportation Discrepancies in Shipments.
When opening the shipping carton to remove the ANCD, check the equipment against the packing slip to
see if the shipment is complete. Report all discrepancies on an SF 364, Report of Discrepancy, as
directed in AR 735-11-2, Reporting of Item and Packaging Discrepancies.
2-7. UNPACKING.
Reference material for unpacking the ANCD is shown in Table 2-1.
2-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |