Quantcast Section XIX. COUPLER INSTALLATION

 

Click here to make tpub.com your Home Page

Page Title: Section XIX. COUPLER INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Section XVIII. TAC-SAT RADIO AND HF RADIO SPEAKER INSTALLATION
Up
TB-9-2320-387-35-4 Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F AN/VRC-89F AN/VRC-90F AN/VRC-91F AN/VRC-92F Manual
Next
Install resilient mount


TB 9-2320-387-35-4
Section XIX. COUPLER INSTALLATION
NOTE
Position coupler mounting plate flush against gas spring bracket.
19-1. Locate, mark, and drill eight 0.281-in. diameter holes (6) in side of wheelhouse (3).
19-2. Cut notch (9) in coupler plate (8) for bump (10) on bottom of wheelhouse (3).
19-3. Install coupler plate (8) on wheelhouse (3) with six capscrews (1A), twelve lockwashers (2),
six spacers (5), and six nuts (4).
19-4. Secure coupler plate (8) to wheelhouse (3) with capscrew (1B), five lockwashers (2), ground strap (7),
spacer (5), and nut (4).
19-5. Secure coupler plate (8) to wheelhouse (3) with capscrew (1C), two lockwashers (2), ground strap (7),
spacer (5), and nut (4).
2
1A
3
9
10
2
1C
4
~
7
2
8
5
6
1B
2
7
2
1.
CAPSCREW MS35307-308 QTY. 8
2.
LOCKWASHER MS45904-71 QTY. 20
4.
NUT MS51971-1 QTY. 8
5.
SPACER 10181-5214-01 QTY. 8
7.
GROUND STRAP 7147-1167-3 QTY. 2
8.
COUPLER MOUNTING PLATE 11080-0511-02 QTY. 1
Figure 5-60.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business