Click here to make tpub.com your Home Page

Page Title: Section XXV. DVE POWER CABLE INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TB 9-2320-387-35-3
Section XXV. DVE POWER CABLE INSTALLATION
NOTE
Previously routed cables have been removed for clarity.
25-1. Route DVE power cable (2) from DCM mount (1) to center of windshield center support (12),
through access cutout (9) in integrated radio rack (10), and under tunnel insulation (11) to rear of
battery box.
25-2. Attach shrink tubing (19) and two terminal lugs (18) and (22) to DVE power cable negative
lead (21) and DVE power cable positive lead (20). (Refer to TM 9-2320-280-20 for terminal
connector repair.)
25-3. Attach DVE power cable positive lead (20) to 24V terminal board (24) with existing nut (17).
25-4. Attach DVE power cable negative lead (21) to ground strap (23) with existing nut (25).
25-5. Secure all leads together with tiedown strap (8).
25-6. Remove two existing screws, lockwasher, and washers from DCM mount (1) and windshield
frame (7).
25-7. Secure two cables (2) and (15) to windshield frame (7) with clamp (16) and screw (14).
25-8. Secure DCM mount (1) to windshield frame (7) with existing washers, lockwashers, and nuts.
25-9. If required, locate, mark, and drill 0.147-in. diameter hole (3) in windshield frame (7).
25-10. Secure two cables (2) and (15) to windshield frame (7) with clamp (13) and screw (14).
25-11. Remove screw (5) and clamp (6) from windshield wiper bracket (4).
25-12. Secure two cables (2) and (15) to windshield wiper bracket (4) with existing clamp (6) and existing
screw (5).
25-13. Secure two cables (2) and (15) to existing cables with tiedown straps (8).
25-14. Install right side tunnel insulation. (Refer to TM 9-2320-280-20.)
25-15. Install batteries. (Refer to TM 9-2320-280-20.)
3
2
4
5
1
6
7
~
16
14
15
13
14
8
12
9
10
2.
DVE POWER CABLE 3256881-3 QTY. 1
8.
TIEDOWN STRAP MS3367-1-0 QTY. A/R
13.
LOOP CLAMP MS21333-76 QTY. 1
14.
SCREW 9421073 QTY. 2
11
16.
LOOP CLAMP MS21333-104 QTY. 1
Figure 5-98.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business