Quantcast Section XX. DVE A-FRAME CABLE GUIDE AND PAN AND TILT MODULE (PTM) MOUNT ASSEMBLY INSTALLATION

 

Click here to make tpub.com your Home Page

Page Title: Section XX. DVE A-FRAME CABLE GUIDE AND PAN AND TILT MODULE (PTM) MOUNT ASSEMBLY INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Section XIX. DVE PAN AND TILT MODULE (PTM) MOUNT ASSEMBLY PREPARATION AND PILLAR MOUNT INSTALLATION
Up
TB-9-2320-387-35-3 Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F AN/VRC-90F Manual
Next
Using A-frame cable guide - TB-9-2320-387-35-30087


TB 9-2320-387-35-3
Section XX. DVE A-FRAME CABLE GUIDE AND PAN AND TILT MODULE
(PTM) MOUNT ASSEMBLY INSTALLATION
20-1. Remove two screws (2), nuts (4), and clamps (1) from A-frame pillar flange (5). Retain hardware.
20-2. Locate and mark cutout area (3) on A-frame pillar flange (5).
20-3. Cut out area (3) of A-frame pillar flange (5). Use fine mill file or crocus cloth to remove all burrs
and sharp edges.
CENTERLINE
OF VEHICLE
2
1
2
3
1
7.62
~
6.50
4
00
1.
5
4
Figure 5-77.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business