Quantcast Section XVI. PLGR POWER CABLE INSTALLATION - TB-9-2320-387-35-20083

 

Click here to make tpub.com your Home Page

Page Title: Section XVI. PLGR POWER CABLE INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Secure PLGR mount and bracket
Up
TB-9-2320-387-35-2 Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F AN/VRC-89F AN/VRC-90F AN/VRC-91F AN/VRC-92F Manual
Next
Section XVII. PLGR ANTENNA INSTALLATION AND CABLE ROUTING


TB 9-2320-387-35-2
Section XVI. PLGR POWER CABLE INSTALLATION
16-1. Route PLGR power cable (2) from PLGR unit (1) to B-beam (3).
1
2
~
3
2
2. PLGR POWER CABLE 9728558-10 QTY. 1
Figure 5-68.
16-2. Attach shrink tubing (7) and terminal lugs (5) and (11) to PLGR power cable negative lead (10) and
PLGR power cable positive lead (8). (Refer to TM 9-2320-387-24-1 for terminal connector repair.)
16-3. Attach PLGR power cable positive lead (8) to 24V terminal board stud (4) with existing nut (6).
16-4. Attach PLGR power cable negative lead (10) to ground strap stud (12) with existing nut (9).
5
6
7
4
8
11
12
7
10
9
5. TERMINAL LUG 7728780 QTY. 1
7. SHRINK TUBING MS23053/4-302-0 QTY. A/R
12. TERMINAL LUG 7728777 QTY. 1
Figure 5-69.
Change 1


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.