Quantcast Section VII. INTEGRATED RACK MOUNTING

 

Click here to make tpub.com your Home Page

Page Title: Section VII. INTEGRATED RACK MOUNTING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Secure three 24V fusewire assemblies - TB-9-2320-387-35-20036
Up
TB-9-2320-387-35-2 Single Channel Ground and Airborne Radio System (SINCGARS) AN/VRC-88F AN/VRC-89F AN/VRC-90F AN/VRC-91F AN/VRC-92F Manual
Next
Figure 5-19.


TB 9-2320-387-35-2
Section VII. INTEGRATED RACK MOUNTING
NOTE
Perform steps 7-1 and 7-2 if blast shield is installed. Perform
steps 7-3 and 7-4 if blast shield is not installed.
7-1. Using rack support (1) as template, locate, mark, and drill three 0.375-in. diameter holes (3) in
blast shield (4) and through tunnel (5).
7-2. Install three inserts (2) in holes (3) in blast shield (4).
1
5
2
4
3
1. RACK SUPPORT 889509-22 QTY. 1
2. INSERT ALS4-616-150 QTY. 3
Figure 5-17.
7-3. Using rack support (1) as template, locate, mark, and drill three 0.375-in. diameter holes (3) in
tunnel (5).
7-4. Install three inserts (2) in holes (3) in tunnel (5).
1
5
2
3
Figure 5-18.


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.