|
| 73. Signal Substitution, Tuning Unit 3
the main unit, and tuning unit 3 signal
generator to warm up for at least l/2 hour
unit 3 signal generator (para 65) with
b e f o r e starting the tests. Set the froni-
p a n e l controls on the test set as follows:
400-cps modulation. Allow tuning unit 3,
b. If. Test Procedure.
160
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |