panel.
relay bracket assembly (15) with the two holes in the
(5)  Install and tighten two screws (1) and flat
control panel.
washers (2) to secure relay bracket assembly (15) to the
(5)  Install and tighten two screws (1) and flat
control panel (17).
washers (2) to secure the relay bracket assembly (15) to
(6)  Refer to figure 3-1. Swing the control panel
the control panel (17)
assembly (13) in and tighten two captive screws (12).
(6)  Refer to figure 3-1. Swing the control panel
assembly (13) in and tighten two captive screws (12).
3-12. Removal and Replacement of Transformer T2
a. Removal. Proceed as follows.
3-13. Removal and Replacement of Control Panel
(1)  Refer to figure 3-2. Remove two screws (1)
TEST Meter M1
and flat washers (2) securing the relay bracket assembly
a. Removal. Proceed as follows.
(15) to the control panel (17).  Retain the attaching
(1)  Refer to figure 3-1. Disengage two captive
hardware for reassembly.
screws (12) on the control panel assembly (13) and
(2)  Refer to figure 3-1. Disengage two captive
swing control panel assembly out.
screws (12) on the control panel assembly (13) and
(2)  Refer to figure 3-2. Remove two nuts (3),
swing the control panel assembly out.
lockwashers (4), and flat washers (5) securing the two
(3)  Refer to figure 3-4. Tag and unsolder four
solder lugs (6) to the back of TEST meter M1 (16). Tag
wires leading from transformer T2 (2) at their destination.
and remove the two solder lugs and retain the attaching
(4)  Remove two screws (13), nuts (4), lock-
hardware for reassembly.
washers (5), and flat washers (3) securing transformer
(3)  Remove four nuts (9), lockwashers (8), and
T2 (2); remove transformer T2. Note location of three
flat washers (7) securing the TEST meter M1 (16) to the
solder lugs (14) secure by the attaching hardware.
control panel (17). Tag solder lug (19), and remove the
Retain the attaching hardware for reassembly.
TEST meter M1.  Retain the attaching hardware for
b. Replacement. Proceed as follows.
reassembly.
(1)  Refer to figure 3-4. Position transformer T2
b. Replacement. Proceed as follows.
(2) on the relay bracket (1), and aline the two mounting
(1)  Refer to figure 3-2. Install TEST meter M1
holes. Ensure that all four wires from transformer T2 are
(16) on the control panel (17).
inserted through the hole in the relay bracket.
(2)  Place solder lug (19) on stud and secure
(2)  Install and tighten two screws (13), flat
TEST meter M1 (16) to the control panel (17) using four
washers (3), lockwashers (5), and nuts (4) to secure
nuts (9), lockwashers (8), and flat washers (7).
transformer T2 (2) to the relay bracket (1). Ensure that
(3)  Place two solder lugs (6) on the terminals at
three solder lugs (14) are located as noted m 3-12a(4),
the back of TEST meter M1 (16). Fasten solder lugs
above.
using two nuts (3), lockwashers (4), and flat washers (5).
(3)  Solder four tagged wires leading from
(4)  Refer to figure 3-1. Swing the control panel
transformer T2 (2).
assembly (13) in and tighten two captive screws (12) to
(4)  Refer to figure 3-2. With the control panel
secure.
(17) partially closed, aline the mounting holes in the
Section III. DIRECT SUPPORT MAINTENANCE OF ATU
WARNING
3-14. General
a. This section provides instructions for performing
Make sure that external ac circuit breaker
and battery supply are switched off and
the maintenance functions allocated to direct support
tagged with a warning not to be turned on
maintenance on the ATU.
b. Support illustrations are provided to aid in the
while maintenance is being performed.
performance  of  procedures.
The  numbers  in
parentheses referenced in the text, e.g., (1), (2), etc,
3-15. Removal and Replacement of Core Assembly
correspond to the item callout on the illustration.
a. Removal. Proceed as follows.
c.  All  wires  removed/unsoldered  during  the
(1)  Refer to figure 3-5 (2).
Using a slot
disassembly  procedure  should  be  tagged  for
screwdriver, unlock the ATU front cover (12) by turning
identification.
latch screw (13).
3-7