Click here to make tpub.com your Home Page

Page Title: Chapter 3. DIRECT SUPPORT MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



TM 11-5825-271-34
CHAPTER 3
DIRECT SUPPORT MAINTENANCE INSTRUCTIONS
Section I. GENERAL
troubleshooting/maintenance instructions in TM 11-5825-
3-1. Introduction
271-12.
a. This  chapter  contains  the  direct  support
b. Appropriate waveforms are shown on the
maintenance instructions for the NDB transmitter and the
schematic diagrams, figures FO-2 to FO-12.  These
ATU There is no direct support maintenance for the
waveforms are provided as a reference and are not
change-over unit.
required for direct support maintenance tasks.
b. Direct  support  maintenance  for  the  NDB
transmitter  and  ATU  comprises  removal  and
replacement of authorized assemblies, subassemblies
3-3. Tools and Test Equipment
and certain chassis-mounted components. Procedures
Tools and test equipment required for direct support
are included in this chapter to make sure that repair has
maintenance tasks are listed in TM 11-5825-271-12
been successfully accomplished.
3-4. Troubleshooting
3-2. Voltage,
Resistance
and
Waveform
Maintenance  procedures,  including  troubleshooting
Measurements
instructions, for direct support maintenance are identical
a. Overall voltage or resistance checks are not
to those authorized at the organizational maintenance
level; refer to TM 11-5825-271-12.
applicable to the maintenance of the NDB transmitter
and  ATU.
Pertinent  resistance  and  voltage
measurements
are
given
in
the
Section II. DIRECT SUPPORT MAINTENANCE OF NDB TRANSMITTER
(2)  Carefully remove two nuts (14), lockwashers
3-5. General
(15), and flat washers (16) securing two solder lugs (17)
a. This section provides instructions for performing
to back of TEST meter M1 (11). Tag solder lugs and
the maintenance functions allocated to direct support
replace the attaching hardware on TEST meter M1.
maintenance on the NDB transmitter.
(3)  Tag and unsolder all cableform  wires
b. Support illustrations are provided to aid in the
terminated at the control panel assembly (13). Before
performance  of  procedures.
The  numbers  in
unsoldering any wire, slide the rubber sleeving away
parentheses referenced in the text, e.g., (1), (2), etc,
from the solder joint so as not to burn it inadvertently
correspond to the item callout on the illustration.
(4)  Remove one screw (10), nut (5), lockwasher
c.  All  wires  removed/unsoldered  during  the
(6), and flat washer (7) securing cable clamp (8).
disassembly  procedure,  should  be  tagged  for
Remove cable clamp from cableform and reinstall on
identification.
control panel assembly (13).
WARNING
(5)  Remove  three  screws  (9),  nuts  (1),
Make sure that external ac circuit breaker
lockwashers (2), and flat washers (3) securing the
and battery supply are switched off and
control panel assembly (13) to the board chassis. Note
tagged with a warning not to be turned on
the location of the cable clamp (18) and solder lug (4) on
while maintenance is being performed
the hinge. Leave cable clamp on cableform and retain
all attaching hardware for reassembly.
3-6. Removal and Replacement of Control Panel
b. Replacement. Proceed as follows.
Assembly
(1)  Refer to figure 3-1.  Prepare the control
a  Removal. Proceed as follows.
panel assembly by removing the cable clamp (8). Retain
(1)  Refer to figure 3-1. Disengage two captive
cable clamp and attaching hardware (5), (6), (7), and (9)
screws (12) on the control panel assembly (13) and
for later use.
swing the control panel assembly out.
3-1


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business